Beckton Outfall Spool Piece Installation, London

Overview

ABCO Divers Ltd mobilised a dive team and all associated equipment for the connection of two spool piece sections between two 3m internal diameter polyethylene pipes, to facilitate the final connection to the newly installed Beckton Outfall pipe.

The works are part of the Thames Water – Lee Tunnel project, the twin culvert outfall is the final discharge point for the prestigious Thames Tideway tunnel that will largely replace London’s network of Victorian brick built sewers & reduce foul sewage discharge into the River Thames from over 35 million cubic meters to less than 2.5 million cubic meters volume per year. 

Project Information

Removal of welded polyethylene blind flanges in two ends of pipe (hydraulic saw or similar)

Installation of two spool piece (approx. 4m long) down on saddles in the polyethylene box and anchoring in place.

Mass Concrete Pour protection of the installation.

Client

Weholite for MVB JV

Date

August 2015

Client Representatives

Mr Vasilios Samaras, Weholite

Category

Commercial Diving Diving - Civil Engineering

Sign Up to our Newsletter


Regulated by


A unique feature of ABCO is the various roles that come together in the delivery of our projects. Click to see a list of some of the roles in our team:

Head Office

282 Moira Road,
Lisburn,
Co Antrim,
BT28 2TU

+44 (0)28 9262 2731

This email address is being protected from spambots. You need JavaScript enabled to view it.

Dublin Office

39 Pinevalley Avenue,
Rathfarnham
Dublin 16
Rep. of Ireland

+44 (0)28 9262 2731

This email address is being protected from spambots. You need JavaScript enabled to view it.

Copyright © ABCO Marine 2018. ALL RIGHTS RESERVED.

Website by Elm House Creative