ABCO Marine (IRL) Ltd were contracted by Frazer Ferries as principle contractor for Carlingford Ferry Site Investigation project. The works are to provide geotechnical information to inform the design and installation of piles supporting a concrete decked slipway for ferry vessels and for laterally loaded fender piles alongside. The works comprise; 

  • 7 No. Rotary Cored boreholes. 

  • 2 No. Cable Percussion boreholes in the overburden. 

  • Plus associated field and laboratory testing and the provision of a factual report.

Project Information

The works comprise rotary drilled investigations positioned at 7 locations (intertidal or sub-tidal), together with associated in-situ and laboratory testing. Also for 2 cable percussive boreholes in the overburden together with associated in-situ and laboratory testing.

Client

RPS for Frazer Ferries

Date

August 2015

Client Representatives

Mr Diarmuid O’Loan, RPS Clients Representative

Category

Site Investigations

Sign Up to our Newsletter


Regulated by


ISO Certification is only applicable to ABCO Head Office at Lisburn

A unique feature of ABCO is the various roles that come together in the delivery of our projects. Click to see a list of some of the roles in our team:

Head Office

282 Moira Road,
Lisburn,
Co Antrim,
BT28 2TU

+44 (0)28 9262 2731

This email address is being protected from spambots. You need JavaScript enabled to view it.

Dublin Office

39 Pinevalley Avenue,
Rathfarnham
Dublin 16
Rep. of Ireland

+44 (0)28 9262 2731

This email address is being protected from spambots. You need JavaScript enabled to view it.

Copyright © ABCO Marine 2020. ALL RIGHTS RESERVED.

Website by Elm House Creative