ABCO Divers Limited were contracted by Seacore as a specialist marine & diving contractor on the 600m x 1800mm OD Margate Storm Outfall for Costains and Southern Water.
Diving Inspections procedures during the marine trenching activities, to form the reception pit in preparation to receive the TBM.
In water dredging activities to remove stone aggregate placed within the reception pit in support of punch out. (LL)
In water operations to expose and inspect the TBM in preparation for flooding a section of the tunnel and detachment in
advance of recovery to the surface.
Diving Operations to install the diffuser system and place scour protection.